2007 Women Build Schedule
|
Pre-Blitz -
Fri |
Pre-Blitz -
Sun |
Day 1 - Sat |
Mon
- Fri |
Day 2 - Sat |
|
5/4/2007 |
5/6/2007 |
5/12/2007 |
5/14
- 5/18 |
5/19/2007 |
|
Build components |
Mark
the plates |
Frame Walls |
Set trusses |
Windows |
|
Build drywall posts |
|
Sheath Walls |
Bracing |
Ext doors w/ trim |
|
Build porch beams |
|
String Walls |
Deck roof |
Deadwood |
| |
|
Porch Beams |
|
House Wrap |
|
Layout slab |
|
|
|
Sub-fascia |
| |
|
|
|
Fascia |
| |
|
|
|
|
| |
|
|
|
Brick freeze
build out |
| |
|
|
|
Drywall garage wall |
| |
|
|
|
Brick wall ties? |
| |
|
|
|
Seal top plate |
| |
|
|
|
|
|
20 |
0 |
75 |
0 |
60 |
| |
|
|
|
|
|
Mon-Fri (2wks) |
Day 3 -
Sat |
Mon
- Wed |
Day 4 -
Thurs |
Day 5 - Sat |
|
5/21
- 6/1 |
6/2/2007 |
6/4
- 6/6 |
6/7/2007 |
6/8/2007 |
|
Trade Roughs |
Prime exterior trim |
Brick |
Drywall start |
Drywall |
| Roof |
Fascia |
|
|
|
| Felt
Roof |
Soffit |
Fans |
|
|
| Drip
Edge |
Fill Penetrations |
Trades |
|
|
| |
Porch trim |
|
|
|
|
Mechanical rough |
Foam/
Caulk windows |
Inspection |
|
|
| Top
plumbing |
Brick freeze
build out |
|
|
|
|
Walkway complete |
Drywall garage wall |
|
|
|
|
Framing inspect |
Install porch posts |
|
|
|
|
Rough inspect |
|
|
|
|
|
Sheath inspect |
|
|
|
|
|
Roofing complete |
|
|
|
|
| |
|
|
|
|
|
0 |
25 |
0 |
40 |
40 |
| |
|
|
|
|
|
Day 6 -
Sat |
Mon-Thurs |
Day 7 - Fri |
Day
8 - Sat |
Mon-Thurs |
|
6/9/2007 |
6/11 - 6/14 |
6/15/2007 |
6/16/2007 |
6/18 - 6/21/2007 |
| Drywall |
tape/bed/texture |
Interior doors |
Int paint coat two |
Electrical Fixtures** |
Paint ext doors
(1 coats) |
|
Interior trim |
Paint ext trim |
Vent Hood** |
| Trim Doors |
Fans |
paint prep |
Clean |
|
| |
Trades |
Int paint coat one |
Paint Int doors |
TXU - Run Conduit |
| |
|
Paint ext. doors
(1 coats) |
Install shelves |
(Vinyl) |
| |
|
Paint shelves |
|
(Cabinets) |
| |
|
Hang Int doors |
|
(Trades Finish) |
| |
|
|
|
(Gutters) |
| |
|
Trades |
|
(Carpet) |
| |
|
Mount Meter Box |
|
|
| |
|
|
|
|
|
40 |
30 |
40 |
30 |
0 |
|
|
|
|
|
|
|
Day 9 - Fri |
Day
10 - Sat |
Day
11 - Sat |
Post Blitz |
Sunday |
|
6/22/2007 |
6/23/2007 |
6/30/2007 |
6/24/2007 |
TBD |
|
Painting |
Painting |
Clean |
|
|
|
Finish Baseboards |
|
Punch List |
Final Inspection |
Dedication |
|
Hang Interior Doors |
|
Hardware |
|
|
|
|
|
Trim Vinyl Floor |
|
|
|
|
|
|
|
|
|
|
|
Appliances** |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40 |
20 |
|
|
|
|
|
|
|
|
|
|
|